News
- Released Lis 2.0.0. (November 1, 2017) New!
- Released Lis 1.8.0. (August 1, 2017)
- Released Lis 1.7.0. (October 22, 2016)
- Released Lis 1.6.0. (September 4, 2016)
- Released Lis 1.5.0. (October 31, 2014)
- Released Lis 1.4.0. (March 8, 2013)
- Released Lis 1.3.0. (December 11, 2012)
- Selected for FY2010 Authorized Project, Earth Simulator Center. (March 30, 2010)
- Selected for FY2009 Authorized Project, Earth Simulator Center. (March 23, 2009)
- Released Lis 1.2.0. (November 12, 2008)
- Selected for FY2008 Authorized Project, Earth Simulator Center. (March 24, 2008)
- Released Lis 1.1.2. (December 24, 2007)
- Updates of SSI Libraries (October 31, 2007)
- Released Lis 1.1.0-beta2. (July 2, 2007)
- Selected for FY2007 Authorized Project, Earth Simulator Center. (March 26, 2007)
- Finished verification of FFTSS 2.0 based volumetric 3D FFT and Lis 1.1 on 8,192 nodes of the Blue Gene System JUBL at Research Centre Juelich (Report). (December, 8, 2006)
- SSI Libraries Available. (November 14, 2006)
- SC06, Tampa, USA (November 11-17, 2006)
- Released Lis 1.0.2. (April 17, 2006)
- Finished verification of Lis 1.1 alpha on 16,384 nodes of the Blue Gene System BGW at IBM T. J. Watson Research Center. (March 31, 2006)
- Selected for FY2006 Authorized Project, Earth Simulator Center. (March 20, 2006)
- Released SILC 1.1 and Lis 1.0.1. (December 5, 2005)
- Finished verification of Lis 1.0 on 8,192 nodes of the Blue Gene System BGW at IBM T. J. Watson Research Center. (October 28, 2005)
- Released Lis 1.0, FFTSS 1,1, and SILC 1.0. (September 20, 2005)
- Signed contract with NIWS Corporation on the verification and the performance evaluation of the SSI Libraries on IBM Blue Gene systems. (August 19, 2005)
- Installed Cray XT3. (March 31, 2005)
- Installed IBM OpenPower 710. (March 30, 2005)
- Signed contract with IBM T. J. Watson Research Center on the development of technologies for scientific computing of the SSI Libraries on IBM Blue Gene sytems. (April 16, 2004)
- Installed Apple Power Mac G5. (November 13, 2003)
- Installed SGI Altrix and PC cluster system. (July 29, 2003)
- Operation started. (April 2003)
- Installed Sun Fire 3800, Cisco Catalyst 6509, and NEC SX-6i. (March 7, 2003)
- Selected for Research Area for The Innovation of Simulation Technology and the Construction of Foundations for its Practical Use, Japan Science and Technology Agency (October 31, 2002)
Home
Copyright (C) 2002 SSI Administration Team
Last modified: Wed Nov 1 19:00:00 JST 2017